Funding for hotels in Montenegro: what applies in 2026 and 2027
Hotels have three routes: a grant from the Eco Fund (Eko-fond) for energy efficiency, a tourism credit line of the Development Bank of Montenegro, and the Go Green loan with EBRD and the EU. In addition, the state programme of tourism support measures will be relaunched in 2027. This page sets out what applies and which deadlines are running.
At a glance
- 11 September 2026: The Eco Fund opens the qualification of contractors for the hotel energy efficiency programme.
- 23 December 2026: Deadline for contractors. After that, the list from which a hotel takes its quote is final.
- 31 December 2026: The tourism credit line of the Development Bank expires.
- Early 2027: The Eco Fund call for hotels is expected. No date has been announced.
- First quarter of 2027: Expected calls under the new programme of tourism support measures.
Grants for energy efficiency
The Eco Fund runs the programme together with the Ministry of Tourism, with money from EU funds. In earlier rounds, more than EUR 2.2 million went to hotels.
What is funded
Thermal insulation, facade windows and doors, efficient heating and cooling such as a heat pump, solar collectors for hot water, LED lighting, cold rooms and building management systems. Photovoltaics for electricity is not included this time.
Who can apply
Hotels registered in the Central Register of Business Entities, based in Montenegro, with a valid categorisation. Hotels registered by the end of 2024 need a positive result for 2025. Hotels open all year round have priority.
How the money flows
The application includes a quote from a company on the list of qualified contractors. The hotel pays its share to this company in advance and proves the payment. After the work is finished, the Eco Fund pays the grant directly to the company, not to the hotel.
An example
For EUR 40,000 in heat pump and LED, the Eco Fund covers up to EUR 28,000 and the hotel's share is EUR 12,000. For EUR 100,000, the grant stays at a maximum of EUR 50,000. The work must be completed within twelve months, in the south with an extension because of the summer building ban.
Two loans that combine with the grant
A loan can carry the own share and the bridge financing until the grant reaches the contractor.
Development Bank of Montenegro
- Programme PRG-26-7 for investment in tourism
- from EUR 10,000, up to 70 % of the investment
- interest 5.40 %, 4.90 % in the north and in less developed municipalities
- term up to twelve years, grace period up to four years
- the credit line runs until 31 December 2026
Go Green with EBRD and EU
- hotels whose company is registered in Montenegro or mainly active there
- EU SME limits: under 250 employees, turnover under EUR 50 million, balance sheet under EUR 43 million
- term 18 to 120 months, grace period at most twelve months
- the bank sets the interest case by case
- a business plan from an external consultant is accepted if it is complete and realistic
Tourism support measures
The Ministry of Tourism published the 2026 calls on 11 May; the deadline closed on 1 June. There will be no further call in 2026. The 2027 programme is in preparation, with calls planned for the first quarter of 2027. The priorities remain season extension, regional balance, infrastructure, digitalisation, flight connections and marketing.
One point many miss: according to the Ministry, consulting costs are not explicitly eligible in 2027 either. The hotel pays for the preparation of its application.
Ready on day one
Choose measures
Where does the building lose energy, and what pays off? The choice decides the size of the grant.
Documents
Register entry, categorisation, 2025 accounts. If one is missing, the deadline is usually too short to catch up.
Quotes
Once the list of qualified contractors is final, compare two or three quotes. The quote is a mandatory attachment.
Financing
Settle the own share and bridge financing, through the Development Bank while the line runs, or through Go Green.
Application
Online through the Eco Fund portal. Those who are prepared apply on the first day.
What hoteliers ask us
How much grant can a hotel in Montenegro receive for energy efficiency?
Up to 70 percent of eligible costs, at most EUR 50,000 per hotel. The hotel covers at least 30 percent from its own, non-public funds.
When will the Eco Fund open its call for hotels?
It is expected in early 2027, once the list of qualified contractors is final. No official date has been announced, and deadlines are usually short.
Is photovoltaics funded?
Not in this round. Funding covers insulation, windows and doors, heating and cooling, solar collectors for hot water, LED, cold rooms and building management systems.
Are consulting costs funded?
According to the Ministry of Tourism, not explicitly in 2027 either. The hotel pays for the preparation of its application.
This page summarises calls and official information as of November 2026. The conditions in each call are binding. Nobody can promise a grant; the decision lies with the Eco Fund.
Does your hotel fit the programme?
Eight questions, five minutes, free of charge. Afterwards you know which routes are open for your property. On request, Ljubo Vuljaj will call you in Montenegrin.